Lahnstein port → Port of Mainz
Lahnstein port to Port of Mainz by train
Lahnstein port
Port of Mainz
A train links Lahnstein port and Port of Mainz, about 57 km apart in a straight line — DB Fernverkehr AG.
Connection details
- Mode
- Rail
- Straight-line distance
- 57 km
- Route
- Rail line
- Operator
- DB Fernverkehr AG
- Services in timetable
- 195
- Timetable covers
- 12/09/2026–12/10/2026
Rail connection reconstructed from Open GTFS (gtfs.de/DELFI open). No live timetable/fare is asserted, only that a real service links these places; the published timetable covers 12/09/2026–12/10/2026. How Head Your Way works.
Or continue by train from Lahnstein port